20MW Tier III+ Operational Data Center | Riyadh North
Prime "Plug-and-Play" Infrastructure for Hyperscale or Sovereign AI Workloads
Price: $265,000,000 (Two Hundred Sixty-Five Million USD)
The Story: Immediate Entry into the Saudi Digital Boom
The Asset: Forget the 3-year construction lead times and the current 2026 global supply chain bottlenecks for transformers. We are offering a fully operational, 20MW IT-load data center located in Riyadh’s most strategic northern industrial zone. This facility is not just "planned"—it is energized, commissioned, and ready for immediate rack-out.
Why Riyadh Now? As of early 2026, the Saudi Data and AI Authority (SDAIA) has mandated that all critical national data must remain within the Kingdom. This has created a massive supply-demand gap. While the 500MW "Hexagon" mega-campuses are still under construction, the market is starving for mid-sized, high-density space that can support the latest AI liquid-cooling requirements.
Technical Excellence:
Capacity: 20MW critical IT load with 2N redundancy on power and N+1 on cooling.
AI Ready: Designed with a hybrid cooling system (Chilled Water + Direct Liquid Cooling loops) to support racks exceeding 50kW density.
Sustainability: Direct PPA connection to the national solar grid, achieving a PUE of 1.28—essential for meeting the 2030 Saudi Green Initiative targets.
Connectivity: Ultra-low latency edge positioning, perfect for the immersive 2030 Expo infrastructure and the Riyadh smart-city grid.
The Investment: At $265 million, this asset is priced competitively for 2026 market rates ($13.25M per MW). For an international investor or a sovereign wealth fund, this represents an immediate capture of the highest rental yields in the MENA region. Avoid the "speed-to-power" race—the power is already here.
Price: $265,000,000 (Two Hundred Sixty-Five Million USD)
The Story: Immediate Entry into the Saudi Digital Boom
The Asset: Forget the 3-year construction lead times and the current 2026 global supply chain bottlenecks for transformers. We are offering a fully operational, 20MW IT-load data center located in Riyadh’s most strategic northern industrial zone. This facility is not just "planned"—it is energized, commissioned, and ready for immediate rack-out.
Why Riyadh Now? As of early 2026, the Saudi Data and AI Authority (SDAIA) has mandated that all critical national data must remain within the Kingdom. This has created a massive supply-demand gap. While the 500MW "Hexagon" mega-campuses are still under construction, the market is starving for mid-sized, high-density space that can support the latest AI liquid-cooling requirements.
Technical Excellence:
Capacity: 20MW critical IT load with 2N redundancy on power and N+1 on cooling.
AI Ready: Designed with a hybrid cooling system (Chilled Water + Direct Liquid Cooling loops) to support racks exceeding 50kW density.
Sustainability: Direct PPA connection to the national solar grid, achieving a PUE of 1.28—essential for meeting the 2030 Saudi Green Initiative targets.
Connectivity: Ultra-low latency edge positioning, perfect for the immersive 2030 Expo infrastructure and the Riyadh smart-city grid.
The Investment: At $265 million, this asset is priced competitively for 2026 market rates ($13.25M per MW). For an international investor or a sovereign wealth fund, this represents an immediate capture of the highest rental yields in the MENA region. Avoid the "speed-to-power" race—the power is already here.
If you are interested to enquire further, please fill in the form below with your details and one of our consultants will contact you shortly.
Get in Touch
We’ll get back to you shortly.